In 2013, SITE was contracted to participate in phase 2B of the multi-phased Christina Lake Regional Project (CLRP). This phase of the SAGD project has a planned additional production capacity of 35,000 bpd.
SITE first cleared and grubbed the right of way area and cut and capped the existing piles. When the site was safely and effectively prepared, we constructed and installed the following:
- Above-ground trunk and lateral pipelines
- High pressure steam pipelines
- Produced emulsion pipelines
- Lift gas pipelines
Location: | Conklin, AB | |||
Services: |
Civil Clearing, Slashing, Logging & Mulching Pipeline |
|||
Project Value: | Less than $5 million | |||
Project Timeframe: | Ongoing | |||
Major Quantities: | 3000m above ground pipeline |