Gathering Line Pipeline

In 2013, SITE was contracted to participate in phase 2B of the multi-phased Christina Lake Regional Project (CLRP). This phase of the SAGD project has a planned additional production capacity of 35,000 bpd.

SITE first cleared and grubbed the right of way area and cut and capped the existing piles. When the site was safely and effectively prepared, we constructed and installed the following:

  • Above-ground trunk and lateral pipelines
  • High pressure steam pipelines
  • Produced emulsion pipelines
  • Lift gas pipelines
 
 
Location:       Conklin, AB
Services:       Civil
Clearing, Slashing, Logging & Mulching
Pipeline
Project Value:       Less than $5 million
Project Timeframe:       Ongoing
Major Quantities:       3000m above ground pipeline
 
 

Related Equipment

Infrastructure Equipment

Access Equipment


 

ABOUT SITE

SITE is a fully-integrated energy services company that provides exceptional environmental, infrastructure and access services for oil, gas and resource development companies.

SITE has the knowledge, the experience, the people, and the dedication to consistently deliver exceptional quality management and assurance with every project. Some of these regions include the northern oil sands, the Interior Plains, the Boreal forest and the Bakken formation of North Dakota, Saskatchewan and Manitoba.


CONTACT US


Call us toll-free: 1.855.408.7483

 

START YOUR NEW CAREER

Job Postings at SITE