Underground Drainage

This project included the completion of the underground storm drainage located in phase F/G of the Christina Lake Regional Project (CLRP).

SITE’s participation in this large multi-phased project included the following:

  • Site preparation – the area was cleared, graded and prepared accordingly;
  • Earthwork services
  • Matting was supplied and installed for stability purposes;
  • Construction and installation of underground pipeline infrastructure was completed.

The storm drainage system was successfully constructed and implemented to collect the water run off from the open areas of the plant site and direct the flow to the storm water pond.

 
 
Location:       Christina Lake, AB
Services:       Civil
Clearing, Slashing, Logging & Mulching
Pipeline
Project Value:       Over $10 million
Project Timeframe:       July 2012 to March 2013
Major Quantities:       4500 of concrete - Storm Drain Piping (300mm to 1200mm)
 
 

Related Equipment

Infrastructure Equipment

Access Equipment


 

ABOUT SITE

SITE is a fully-integrated energy services company that provides exceptional environmental, infrastructure and access services for oil, gas and resource development companies.

SITE has the knowledge, the experience, the people, and the dedication to consistently deliver exceptional quality management and assurance with every project. Some of these regions include the northern oil sands, the Interior Plains, the Boreal forest and the Bakken formation of North Dakota, Saskatchewan and Manitoba.


CONTACT US


Call us toll-free: 1.855.408.7483

 

START YOUR NEW CAREER

Job Postings at SITE