SITE was contracted to assist in the brackish water pipeline project in Cold Lake, Alberta starting in 2011.
We constructed 6,370 meters of small diameter pipeline across varied terrain, including waterways, populated areas and roads and highways. This 219.1 x 4.8mm triple random length steel pipe was trenched and installed from the source well to the facility, and further extended to the Central Processing Facility.
During the process, SITE used horizontal directional drilling to bore into the pipe in order that it was safely installed across sensitive areas, such as urban areas, roads and waterways.
Project Value: | Less than $5 million |