In 2011, SITE started the groundwork for a large construction project known as the Lynton Station in Fort McMurray.
The scope of work started with the stripping and stockpiling of all topsoil and unsuitable materials. Then a concrete slab was added and a tank base constructed on the prepared site. In addition, SITE successfully completed the following:
- Construction of site roads, trench ploughing, drainage ditches and culverts;
- Construction of road/containment berms around the pump station;
- Excavation of the containment pond.
Location: | Fort McMurray, AB | |||
Services: |
Civil Clearing, Slashing, Logging & Mulching Remediation & Reclamation |
|||
Project Value: | Over $10 million | |||
Project Timeframe: | Ongoing | |||
Major Quantities: | 400,000 m3 |