• Home /
  • Login
 
    Projects
    • Access
    • Infrastructure
      • GS#2 (HRTD) Project
      • GS #4 Camp Preparation
      • Gathering Line Pipeline
      • KXL Stockpile sites
      • Plant Site Facility
      • Underground Drainage
      • Site Preparation/Pond Construction
      • MEG Pipeline
      • Brackish Water Pipeline
      • Foster Creek FCO 2013
      • Highway 63 Water & Sewer Main
      • Enbridge HPP Mainline
      • Suncor Firebag
    • Environmental

Foster Creek FCO 2013

The FCO 2013 project consists of pipelines, roads and utility corridors connecting six new heavy oil production pads to the Foster Creek SAGD Commercial facility.

SITE involvement consisted of the construction of NPS 12 steam lines, NPS 8 emulsion lines, NPS 6 casing gas lines and NPS 4 fuel gas lines.

 
 
 
Project Value:       Less than $5 million
 
Print Page
 
 

ABOUT SITE

SITE is a fully-integrated energy services company that provides exceptional environmental, infrastructure and access services for oil, gas and resource development companies.

SITE has the knowledge, the experience, the people, and the dedication to consistently deliver exceptional quality management and assurance with every project. Some of these regions include the northern oil sands, the Interior Plains, the Boreal forest and the Bakken formation of North Dakota, Saskatchewan and Manitoba.


CONTACT US


Call us toll-free: 1.855.408.7483

 

START YOUR NEW CAREER

Job Postings at SITE

 

 
 
© 2025 SITE. All Rights Reserved. Legal | Employee Webmail | Login | Twitter | LinkedIn
Toll Free: 1 (855) 408-SITE (7483)
SITE

Head Office

#170, 120 Pembina Road
Sherwood Park Alberta T8H 0M2